Recessed garden entry at Mallow.
← The plan collection

Desert Contemporary · 712 SQ FT

Mallow.

Two bedrooms share the quiet west side of the plan. A short hall serves both bedrooms, the bathroom and a stacked laundry cabinet.

Customize this concept

Your vision. Your layout. Designed to match your home. Explore custom design ↗

STEP INSIDE THE IDEAIllustrative architectural renderingDesign concept
Enclosed gross area
712 sq ft
Bedrooms
2 bedrooms
Bathrooms
1
Clear ceilings
10 ft
Exterior envelope
28′ × 26′, recessed entry

A STARTING POINT FOR YOUR HOME

Start with this layout. Make it yours.

Use Mallow as inspiration. We can explore changes to the layout, rooflines, materials, windows and colors to complement your existing home and bring your vision to life.

How we customize your ADU

A CLEAR STARTING POINT

Picture the home.
Understand the budget.

Start with Mallow, then make it your own. Your property review connects the plan, your selections and the work needed on your lot to a personalized quote.

Explore the ADU pricing guide See the project timeline

MALLOW · BASE ADU

Site-specific estimate

The scope, access, utility connections and finish selections determine the estimate for your property.

What to plan for

  • Permit and jurisdictional plan-review fees and fill are excluded.
  • Kitchen and laundry appliances are owner supplied.
  • Renderings may show upgraded finishes, furnishings and outdoor features. Your written scope and allowances define the included work.

Your initial consultation and design are provided at no cost. Payments begin when you choose to move forward with an agreement. See the payment milestones

Request site-specific pricing

COMFORT, BUILT INTO EVERY NEW ADU

A beautiful home.
A better everyday.

See what makes the difference
  • Deeper walls. More insulation space.
  • Spray foam. Fewer air leaks.
  • LEDs. Less lighting energy.
  • Low-E glass. Managed solar heat.
  • Efficient cooling. Sized for your ADU.

PRODUCTS BEHIND THE POSSIBILITIES

Explore the details that help a home feel better.

Pella or Avanti windows; BASF insulation and Goodman cooling are product options. Your written scope identifies the selected products and models.

A quiet hall for two bedrooms

Two bedrooms share the quiet west side of the plan. A short hall serves both bedrooms, the bathroom and a stacked laundry cabinet.

The central service wall gives the sofa a place to face the television. Across the room, an east-facing kitchen window lights the sink and family table.

Explore the design

Recessed garden entry
Family living room
Kitchen and dining
Bedroom hall and stacked laundry
Second bedroom
Hall bath

The dimensioned floor plan

Mallow dimensioned two-bedroom plan with two bedrooms, short hall and stacked laundry

Download the dimensioned concept plan (PDF)

YOUR PROJECT, STEP BY STEP

From the first idea
to a place of your own.

Three clear phases. A team to guide the details. And a better sense of what comes next.

Early planning range

6–9 months

Approximately, from planning kickoff through construction.

Phase 01 · About 30 days

A clear direction, before we build.

Your initial consultation and design are at no cost. We start with your property and the way you want to live, then develop the design direction, project scope and a more informed budget.

What you receive

A clearer picture of the design, scope, budget and property questions to resolve before moving forward.

Your next step

Share your property address, goals, preferred plan and budget. Identify the features and finishes that matter most to you.

Payments begin when you choose to move forward with an agreement, with a 10% initial deposit. The next phase begins after your agreement and scope are in place.

Phase 02 · About 60–90 days

The right preparation for your property.

With your agreement in place, we coordinate the permit package and work through the local review process. Required documents and studies depend on your property and agreed scope.

What you receive

Updates on the permit package, review progress and any decisions or additional information needed from you.

Your next step

Provide requested property records and timely approvals. Keep design changes coordinated so the permit documents stay aligned.

The reviewing authority determines approval and timing. Construction depends on required approvals and project readiness.

Phase 03 · About 3–5 months

Watch your next chapter take shape.

Our builders and project managers coordinate the work, inspections and finish details. You receive a construction schedule and project updates through Buildertrend as the work progresses.

What you receive

A construction schedule, progress updates and visibility into upcoming decisions. Progress payments follow the milestones in your agreement.

Your next step

Finalize selections on schedule, respond to project questions and arrange progress payments at the agreed milestones.

The finish date is confirmed through the project schedule as site conditions, selections, inspections and work progress become clear.

These are early estimates. Your property, scope, permit review and selections shape the actual schedule.

Explore the full process & date estimator

A STARTING POINT. YOUR OWN DIRECTION.

Let’s find its place
on your property.

Use this floor plan as inspiration. We can adapt the rooms, entries and exterior to your household and existing home, with the property, utilities, privacy and local review process in view.

Images illustrate architectural character. Openings, cabinetry, furnishing positions, landscape, pools and exterior features may vary from the schematic plan and become defined in your project scope.

Start with this concept How we design to match your home

KEEP EXPLORING

A few more possibilities.

Explore all the plans

Starting prices use $250 per sq ft of enclosed gross area. Your property, finishes and selected additions shape the final quote. Review the base scope and options